Vetting decides which vessels can trade. NaviVett is the operating layer for it — inspector nominations, SIRE 2.0 workflows and Oil Major clearance in one live queue, tracked to the deadline.
Updates arrive out of order, inspector windows lapse unnoticed, and off-hire shows up as a surprise on the P&L rather than a risk anyone tracked.
RCA and Corrective Action deadlines stretch superintendents thin. Every slipped response raises the odds of an Oil Major rejection on the next fixture.
Three surfaces, one record. Operations run the queue, superintendents draft inside the clock, and management sees the fleet.
Live tracking of inspector nominations, port compatibility and expiring SIRE reports, with alerts that fire before the window closes.
Structured workflows walking superintendents through RCA, CA and PA drafting, aligned to OCIMF guidelines.
Executive reporting on clearance speed, recurring observation trends and Oil Major acceptance rates across the fleet.
Nothing here is new work for the fleet. It is the work you already do, held somewhere it cannot be lost.
NaviVett runs the vetting queue for a 78-vessel fleet today. The same workflow that clears a vessel for one Oil Major carries the evidence into the next inspection, so the fleet's record compounds instead of resetting.
New operators start on a 30-day pilot across five vessels — enough cycles to see turnaround move before anything is signed.
Request the full recordObservations, RCAs and clearance history are the fleet's own record. NaviVett stores them per operator and never pools them.
Fleet data is partitioned by operator. No cross-client benchmarking without written consent.
Superintendents, chartering and management see only the vessels and fields their role covers.
Every status change, submission and approval is timestamped and attributable — exportable for TMSA review.
“In maritime operations, vetting isn't just compliance — it is the ultimate commercial passport for your vessel.”
Built by captains who have sat on both sides of the inspection, and know what a stuck approval costs a fixture.
Thirty days, five vessels, no change to your existing processes. We report on what moved.
or write to hello@navivett.com